BILL · 1991–92 SESSION · LATEST VERSION SSB 6208

SB 6208: PUD electrical service

Allowing private electrical contractors to install a PUD electrical service.

Summary

  • If a Public Utility District (PUD) offers electrical service and directly assesses its customers a service installation charge, customers may contract with a qualified electrical contractor to install services. Written approval of the PUD is required.

From the Senate Bill Report (SB 6208), written by the Legislature's nonpartisan staff. Read the full report ↗

Did not pass Did not pass · stalled on the Senate floor
  1. IntroducedJan 21, 1992
  2. Out of committeestopped here
  3. Passed Senate
  4. Passed House
  5. Governor
  6. Law
Prime sponsor
Tim Erwin (R-44)
Introduced
January 21, 1992 in the Senate
Last action
February 27, 1992
Versions
SB 6208, SSB 6208

Sponsors

Prime sponsor: Tim Erwin (R-44)

2 co-sponsors (1 Democrat, 1 Republican)

Votes

No recorded floor votes.

History

The Legislature's online data doesn't include step-by-step history for sessions before 2001. Its final status is shown above, and the official bill page may have more.

SB 6208 in other sessions

Bill numbers restart every two years, so the same number is a different bill in each session.

Report wrong or missing information on this page