BILL · 1993–94 SESSION · LATEST VERSION SHB 2385

HB 2385: Water right permits

Changing provisions relating to water right permits.

Summary

  • Water Right Applications The priority date of a water right is based on the date that a completed water right application is filed with the Department of Ecology. The department is directed to adopt rules by January 1, 1995, which specify the required contents of a completed application form and the timelines the department is to follow in determining if an application is complete.

From the House Bill Report (HB 2385), written by the Legislature's nonpartisan staff. Read the full report ↗

Did not pass Did not pass · died in committee
  1. IntroducedJan 14, 1994
  2. Out of committeestopped here
  3. Passed House
  4. Passed Senate
  5. Governor
  6. Law
Prime sponsor
R Wesley Pruitt (D-26)
Introduced
January 14, 1994 in the House
Last action
March 11, 1994
Budget
Has a fiscal note
Versions
HB 2385, SHB 2385

Sponsors

Prime sponsor: R Wesley Pruitt (D-26)

Votes

No recorded floor votes. This measure never reached a floor vote.

History

The Legislature's online data doesn't include step-by-step history for sessions before 2001. Its final status is shown above, and the official bill page may have more.

HB 2385 in other sessions

Bill numbers restart every two years, so the same number is a different bill in each session.

Report wrong or missing information on this page