SB 5860: Transprtn project cost estim

Improving transportation project cost estimates.

Summary

  • The department is required to submit separate appropriation requests for the preliminary engineering/right of way phase and construction phase for any improvement project with an estimated total cost of $15 million or greater. Substitute Bill Compared to Original Bill: The requirement that the department use the design engineer as the construction engineer on a trial basis is eliminated.

From the Senate Bill Report (SB 5860), written by the Legislature's nonpartisan staff. Read the full report ↗

Did not pass Did not pass · died in committee
  1. IntroducedFeb 10, 1995
  2. Out of committeestopped here
  3. Passed Senate
  4. Passed House
  5. Governor
  6. Law
Prime sponsor
Margarita Prentice (D-11)
Introduced
February 10, 1995 in the Senate
Last action
January 8, 1996
Versions
SB 5860, SSB 5860

Sponsors

Votes

No recorded floor votes. This measure never reached a floor vote.

History

The Legislature's online data doesn't include step-by-step history for sessions before 2001. Its final status is shown above, and the official bill page may have more.

SB 5860 in other sessions

Bill numbers restart every two years, so the same number is a different bill in each session.

Report wrong or missing information on this page