BILL · 1995–96 SESSION

SB 5938: Energy project output

Clarifying physical conditions for determining the output of major energy projects.

Summary

  • The definition that determines whether an energy project is considered by the Energy Facility Site Evaluation Council is clarified by stating the 250 megawatt generating threshold for electricity production is measured using maximum continuous electric generating capacity, less minimum auxiliary load, at average ambient temperature and pressure.

From the Senate Bill Report (SB 5938), written by the Legislature's nonpartisan staff. Read the full report ↗

Did not pass Did not pass · died in committee
  1. IntroducedFeb 15, 1995
  2. Out of committeestopped here
  3. Passed Senate
  4. Passed House
  5. Governor
  6. Law
Prime sponsor
Albert Bauer (D-49)
Introduced
February 15, 1995 in the Senate
Last action
January 8, 1996
Companion bill
HB 1761
Budget
Has a fiscal note

Sponsors

Prime sponsor: Albert Bauer (D-49)

3 co-sponsors (1 Democrat, 2 Republicans)

Votes

No recorded floor votes. This measure never reached a floor vote.

History

The Legislature's online data doesn't include step-by-step history for sessions before 2001. Its final status is shown above, and the official bill page may have more.

SB 5938 in other sessions

Bill numbers restart every two years, so the same number is a different bill in each session.

Report wrong or missing information on this page