BILL · 1995–96 SESSION

SB 6145: Permit processing

Changing permit processing.

Summary

  • The Department of Ecology is required to determine within 15 days of receipt of an application whether the application is likely to be processed within 180 days. If the permit cannot be processed within 180 days or there is a current permit backlog, the applicant may take the application to a private consultant to draft a permit proposal.

From the Senate Bill Report (SB 6145), written by the Legislature's nonpartisan staff. Read the full report ↗

Did not pass Did not pass · died in committee
  1. IntroducedJan 8, 1996
  2. Out of committeestopped here
  3. Passed Senate
  4. Passed House
  5. Governor
  6. Law
Prime sponsor
Dan Swecker (R-20)
Introduced
January 8, 1996 in the Senate
Last action
January 8, 1996
Budget
Has a fiscal note

Sponsors

Prime sponsor: Dan Swecker (R-20)

Votes

No recorded floor votes. This measure never reached a floor vote.

History

The Legislature's online data doesn't include step-by-step history for sessions before 2001. Its final status is shown above, and the official bill page may have more.

SB 6145 in other sessions

Bill numbers restart every two years, so the same number is a different bill in each session.

Report wrong or missing information on this page