BILL · 1997–98 SESSION · LATEST VERSION SHB 2877

HB 2877: Pine Hollow reservoir

Ordering an analysis of Pine Hollow as a site of a dam and reservoir.

Summary

  • The Department of Ecology (DOE) must conduct a pre-construction analysis of Pine Hollow regarding its suitability as a site for the construction of a retainment dam and water storage reservoir. The analysis is to include an analysis of the geology and hydrology of the site and appropriate dam design and dynamics.

From the House Bill Analysis (HB 2877), written by the Legislature's nonpartisan staff. Read the full report ↗

Did not pass Did not pass · died in committee
  1. IntroducedJan 21, 1998
  2. Out of committeestopped here
  3. Passed House
  4. Passed Senate
  5. Governor
  6. Law
Prime sponsor
Jim Clements (R-14)
Introduced
January 21, 1998 in the House
Last action
February 6, 1998
Budget
Makes appropriations
Versions
HB 2877, SHB 2877

Sponsors

Prime sponsor: Jim Clements (R-14)

4 co-sponsors (0 Democrats, 4 Republicans)

Votes

No recorded floor votes. This measure never reached a floor vote.

History

The Legislature's online data doesn't include step-by-step history for sessions before 2001. Its final status is shown above, and the official bill page may have more.

HB 2877 in other sessions

Bill numbers restart every two years, so the same number is a different bill in each session.

Report wrong or missing information on this page