BILL · 1999–00 SESSION
SB 5080: Biomedical waste operations
Requiring hazard analysis and critical control points plans for biomedical waste operations.
Summary
- Within two years, each facility that deactivates biomedical waste under a solid waste permit must develop a hazard analysis and critical control point (HACCP) plan. The plan must be updated every two years and new operations must complete a plan prior to beginning operations.
From the Senate Bill Report (SB 5080), written by the Legislature's nonpartisan staff. Read the full report ↗
Did not pass Did not pass · died in committee
- IntroducedJan 12, 1999
- Out of committeestopped here
- Passed Senate
- Passed House
- Governor
- Law
- Prime sponsor
- Dan Swecker (R-20)
- Introduced
- January 12, 1999 in the Senate
- Last action
- January 10, 2000
- Budget
- Has a fiscal note
Sponsors
Prime sponsor: Dan Swecker (R-20)
Votes
No recorded floor votes. This measure never reached a floor vote.
History
The Legislature's online data doesn't include step-by-step history for sessions before 2001. Its final status is shown above, and the official bill page may have more.
SB 5080 in other sessions
Bill numbers restart every two years, so the same number is a different bill in each session.
- SB 5080 (2025–26) Financial education
- SB 5080 (2023–24) Cannabis social equity
- SB 5080 (2021–22) Youth ed. programming funds
- SB 5080 (2019–20) Offender reentry/education
- SB 5080 (2017–18) Real property damage actions
- SB 5080 (2015–16) Dual credit educ. options
- SB 5080 (2013–14) DNR recreation site access
- SB 5080 (2011–12) Water pollution/sewage