BILL · 2003–04 SESSION · LATEST VERSION SHB 2340

HB 2340: Electrical transmission

Regarding electrical transmission.

Summary

  • Allows a person developing new transmission in excess of 115 kilovolts to seek site certification through EFSEC.

From the House Bill Analysis (HB 2340), written by the Legislature's nonpartisan staff. Read the full report ↗

Did not pass Did not pass · stalled on the House floor
  1. IntroducedJan 12, 2004
  2. Out of committeeJan 26, 2004
  3. Passed Housestopped here
  4. Passed Senate
  5. Governor
  6. Law
Prime sponsor
Jeff Morris (D-40)
Introduced
January 12, 2004 in the House
Last action
March 1, 2004
Versions
HB 2340, SHB 2340

AN ACT Relating to siting electrical transmission under the energy facility site evaluation council;

Sponsors

Prime sponsor: Jeff Morris (D-40)

2 co-sponsors (1 Democrat, 1 Republican)

Votes

No recorded floor votes.

History

  1. Referred to Rules 2 Consideration. (SHB 2340)
  2. Referred to Rules 2 Consideration.
  3. Placed on second reading by Rules Committee. (SHB 2340)
  4. Placed on second reading by Rules Committee.
  5. Passed to Rules Committee for second reading. (SHB 2340)
  6. Passed to Rules Committee for second reading.
  7. TTE - Majority; 1st substitute bill be substituted, do pass. (SHB 2340)
  8. Minority; do not pass. (SHB 2340)
  9. Minority; do not pass.
  10. TTE - Majority; 1st substitute bill be substituted, do pass.
  11. TTE - Executive action taken by committee.
  12. First reading, referred to Technology, Telecommunications & Energy.
  13. Prefiled for introduction.

HB 2340 in other sessions

Bill numbers restart every two years, so the same number is a different bill in each session.

Report wrong or missing information on this page