BILL · 2003–04 SESSION
SB 6089: State route no. 28
Redirecting cost savings from a highway construction project at the state route No. 2/97 interchange to a highway construction project on state route No. 28 in Douglas county.
Summary
- Provides that, if the transportation commission determines that the safety needs at the US2/97 Peshastin East - Interchange may be met with a design of lesser cost, then the savings from the US2/97 Peshastin East - Interchange project may be applied to the SR28/East End of the George Sellar Bridge project.
From the Bill Digest (SB 6089), written by the Legislature's nonpartisan staff. Read the full report ↗
Did not pass Did not pass · died in committee
- IntroducedJun 4, 2003
- Out of committeestopped here
- Passed Senate
- Passed House
- Governor
- Law
- Prime sponsor
- Linda Evans Parlette (R-12)
- Introduced
- June 4, 2003 in the Senate
- Last action
- January 12, 2004
AN ACT Relating to redirecting cost savings from a highway construction project at the state route No. 2/97 interchange to a highway construction project on state route No. 28 in Douglas county;
Sponsors
Prime sponsor: Linda Evans Parlette (R-12)
Votes
No recorded floor votes. This measure never reached a floor vote.
History
- By resolution, reintroduced and retained in present status.
- By resolution, reintroduced and retained in present status.
- First reading, referred to Highways & Transportation.
SB 6089 in other sessions
Bill numbers restart every two years, so the same number is a different bill in each session.
- SB 6089 (2025–26) Education data/P20W system
- SB 6089 (2023–24) Electrical inspector reqs.
- SB 6089 (2019–20) Marijuana odor task force
- SB 6089 (2017–18) State gen. obligation bonds
- SB 6089 (2015–16) Health benefit exchange
- SB 6089 (2013–14) Eminent domain
- SB 6089 (2011–12) Telephone campaign ads
- SB 6089 (2009–10) Eligible renewable resource