BILL · 2007–08 SESSION

HB 3157: Water-sewer dist contracts

Increasing estimated cost minimums required on water-sewer district contracts for materials and work.

Summary

  • Requires all work ordered, the estimated cost of which is in excess of twenty-five thousand dollars, to be let by contract and competitive bidding. Requires any purchase of materials, supplies, or equipment, with an estimated cost in excess of twenty-five thousand dollars, to be by contract.

From the Bill Digest (HB 3157), written by the Legislature's nonpartisan staff. Read the full report ↗

Did not pass Did not pass · died in committee
  1. IntroducedJan 23, 2008
  2. Out of committeestopped here
  3. Passed House
  4. Passed Senate
  5. Governor
  6. Law
Prime sponsor
Dean Takko (D-19)
Introduced
January 23, 2008 in the House
Last action
January 23, 2008
Companion bill
SB 6636

AN ACT Relating to increasing estimated cost minimums required on water-sewer district contracts for materials and work;

Sponsors

Prime sponsor: Dean Takko (D-19)

2 co-sponsors (1 Democrat, 1 Republican)

Votes

No recorded floor votes. This measure never reached a floor vote.

History

  1. First reading, referred to State Government & Tribal Affairs.

HB 3157 in other sessions

Bill numbers restart every two years, so the same number is a different bill in each session.

Report wrong or missing information on this page