BILL · 2007–08 SESSION

SB 6719: PUD bid limits

Increasing public utility district bid limits.

Summary

  • The maximum estimated cost of work done by PUDs without contracting is raised from $10,000 to $25,000, and the maximum cost of material used in work by PUDs without contracting is raised from $50,000 to $200,000. PUD Materials Contracting.

From the Senate Bill Report (SB 6719), written by the Legislature's nonpartisan staff. Read the full report ↗

Did not pass Did not pass · died in committee
  1. IntroducedJan 22, 2008
  2. Out of committeestopped here
  3. Passed Senate
  4. Passed House
  5. Governor
  6. Law
Prime sponsor
Karen Keiser (D-33)
Introduced
January 22, 2008 in the Senate
Last action
January 28, 2008
Companion bill
HB 3135

AN ACT Relating to increasing public utility district bid limits to address inflation and increased material costs;

Sponsors

Prime sponsor: Karen Keiser (D-33)

5 co-sponsors (3 Democrats, 2 Republicans)

Votes

No recorded floor votes. This measure never reached a floor vote.

History

  1. Referred to Water, Energy & Telecommunications.
  2. And refer to Water, Energy & Telecommunications.
  3. LCRD - Majority; without recommendation.
  4. First reading, referred to Labor, Commerce, Research & Development.

SB 6719 in other sessions

Bill numbers restart every two years, so the same number is a different bill in each session.